Blocry swimming poolLouvain La Neuve, Belgium · Completed
Design Style
Public Pool
Location
Louvain La Neuve, Belgium
Concept
New build
Square Footage
8000 m²
Status
Completed 2024
Client
- UCLouvain - The City of Ottignies-Louvain-la-Neuve - The Wallonia-Brussels Federation
Architect
B2Ai Architects
Contractor
Artes TWT

At the new Blocry swimming complex in Louvain-la-Neuve, TB-D was responsible for the specialised tiling works of the 50 × 25 metre Olympic-size pool. A project of this scale required precise execution and careful attention to every detail, resulting in a durable and high-quality finish throughout the pool.